undefined
+
  • undefined

编号 :

SY-ST1

guide plate

零售价

市场价


Material:Stainless steel, Aluminum alloy,Zinc Alloy,Magnesium alloy,cold-roll steel sheets,Brass Finish : Polishing, Powder coating, Painting,Electroplating,Brushing and Etc, Main Equipment:  Stamping machine Drawing format: STEP,STP,GIS,CAD,PDF,DWG,DXF etc or samples. Tolerance: +/-0.01mm +/-0.05mm  MOQ :10 sets Mould cost : Depends on production design Mould lead time : Around 25 days Sample MOQ :10 sets Sample leadtime: around 7-10 days Production time: 1000 sets take around 1 months

Product Number: SY-ST1

Category: Stamping parts
Key words: mould

Download:

Quantity
-
+

库存

隐藏域元素占位

  • Product Description
  • Key attributes
  • Overview
  • Applicable to multiple fields
  • FAQ
  • Material:Stainless steel, Aluminum alloy,Zinc Alloy,Magnesium alloy,cold-roll steel sheets,Brass
    Finish : Polishing, Powder coating, Painting,Electroplating,Brushing and Etc,
    Main Equipment:  Stamping machine
    Drawing format: STEP,STP,GIS,CAD,PDF,DWG,DXF etc or samples.
    Tolerance: +/-0.01mm +/-0.05mm 

    MOQ :10 sets
    Mould cost : Depends on production design
    Mould lead time : Around 25 days
    Sample MOQ :10 sets
    Sample leadtime: around 7-10 days
    Production time: 1000 sets take around 1 months

FAQ



answer

Yes, we can provide you sample before mass order.


answer

If in Stock: around 3 days after payment. Mass production: around 20~25 days after receipt of deposit (Accurate delivery time depends on specific items and quantities)


answer

We have profesional QC department to guarantee the quality.


answer

You can choose any mode of transportation you want, sea delivery, air delivery or door to door express.

< 123 >

Get in touch with us


Submit